[{"series_title":"Decision Engineering","publisher":"Springer","citation":{"bjps":"<b>Deuter A <i>et al.</i></b> (2019) Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study. In Stark J (ed.), <i>Product Lifecycle Management (Volume 4)</i>. Cham, Switzerland: Springer, pp. 125–143.","chicago-de":"Deuter, Andreas, Andreas Otte, Marcel Ebert und Frank Possel-Dölken. 2019. Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study. In: <i>Product lifecycle management (Volume 4)</i>, hg. von John Stark, 125–143. Decision Engineering. Cham, Switzerland: Springer. doi:<a href=\"https://doi.org/10.1007/978-3-030-16134-7_11\">10.1007/978-3-030-16134-7_11</a>, .","chicago":"Deuter, Andreas, Andreas Otte, Marcel Ebert, and Frank Possel-Dölken. “Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study.” In <i>Product Lifecycle Management (Volume 4)</i>, edited by John Stark, 125–43. Decision Engineering. Cham, Switzerland: Springer, 2019. <a href=\"https://doi.org/10.1007/978-3-030-16134-7_11\">https://doi.org/10.1007/978-3-030-16134-7_11</a>.","short":"A. Deuter, A. Otte, M. Ebert, F. Possel-Dölken, in: J. Stark (Ed.), Product Lifecycle Management (Volume 4), Springer, Cham, Switzerland, 2019, pp. 125–143.","mla":"Deuter, Andreas, et al. “Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study.” <i>Product Lifecycle Management (Volume 4)</i>, edited by John Stark, Springer, 2019, pp. 125–43, <a href=\"https://doi.org/10.1007/978-3-030-16134-7_11\">https://doi.org/10.1007/978-3-030-16134-7_11</a>.","din1505-2-1":"<span style=\"font-variant:small-caps;\">Deuter, Andreas</span> ; <span style=\"font-variant:small-caps;\">Otte, Andreas</span> ; <span style=\"font-variant:small-caps;\">Ebert, Marcel</span> ; <span style=\"font-variant:small-caps;\">Possel-Dölken, Frank</span>: Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study. In: <span style=\"font-variant:small-caps;\">Stark, J.</span> (Hrsg.): <i>Product lifecycle management (Volume 4)</i>, <i>Decision Engineering</i>. Cham, Switzerland : Springer, 2019, S. 125–143","van":"Deuter A, Otte A, Ebert M, Possel-Dölken F. Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study. In: Stark J, editor. Product lifecycle management (Volume 4). Cham, Switzerland: Springer; 2019. p. 125–43. (Decision Engineering).","ieee":"A. Deuter, A. Otte, M. Ebert, and F. Possel-Dölken, “Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study,” in <i>Product lifecycle management (Volume 4)</i>, J. Stark, Ed. Cham, Switzerland: Springer, 2019, pp. 125–143. doi: <a href=\"https://doi.org/10.1007/978-3-030-16134-7_11\">10.1007/978-3-030-16134-7_11</a>.","havard":"A. Deuter, A. Otte, M. Ebert, F. Possel-Dölken, Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study, in: J. Stark (Ed.), Product Lifecycle Management (Volume 4), Springer, Cham, Switzerland, 2019: pp. 125–143.","ufg":"<b>Deuter, Andreas u. a.</b>: Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study, in: <i>Stark, John (Hg.)</i>: Product lifecycle management (Volume 4), Cham, Switzerland 2019 (Decision Engineering),  S. 125–143.","ama":"Deuter A, Otte A, Ebert M, Possel-Dölken F. Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study. In: Stark J, ed. <i>Product Lifecycle Management (Volume 4)</i>. Decision Engineering. Springer; 2019:125-143. doi:<a href=\"https://doi.org/10.1007/978-3-030-16134-7_11\">10.1007/978-3-030-16134-7_11</a>","apa":"Deuter, A., Otte, A., Ebert, M., &#38; Possel-Dölken, F. (2019). Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study. In J. Stark (Ed.), <i>Product lifecycle management (Volume 4)</i> (pp. 125–143). Springer. <a href=\"https://doi.org/10.1007/978-3-030-16134-7_11\">https://doi.org/10.1007/978-3-030-16134-7_11</a>"},"keyword":["Product lifecycle management","Application Lifecycle Management","Smart products","Systems engineering"],"publication":"Product lifecycle management (Volume 4)","doi":"10.1007/978-3-030-16134-7_11","publication_identifier":{"eisbn":["978-3-030-16134-7"],"isbn":["978-3-030-16133-0"],"eissn":["2197-6589"],"issn":["1619-5736"]},"publication_status":"published","department":[{"_id":"DEP7022"},{"_id":"DEP1306"}],"title":"Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study","place":"Cham, Switzerland","author":[{"first_name":"Andreas","orcid":"0000-0002-6529-6215","id":"62088","full_name":"Deuter, Andreas","last_name":"Deuter"},{"first_name":"Andreas","id":"51466","full_name":"Otte, Andreas","last_name":"Otte"},{"first_name":"Marcel","full_name":"Ebert, Marcel","last_name":"Ebert"},{"full_name":"Possel-Dölken, Frank","last_name":"Possel-Dölken","first_name":"Frank"}],"status":"public","page":"125-143","_id":"7783","type":"book_chapter","abstract":[{"lang":"eng","text":"The digitization of the industry, the drive towards smart factories as well as the Internet of Production (IoP) require rising smartness of products and services. Smart physical products are often mechatronic products that include increasing amounts of software. The development of software, however, comes along with new challenges for companies specialized in developing mechanical, electrical or electronic products. Some of these challenges address the product lifecycle management (PLM)-related business and work processes. The management of software lifecycles requires a much more rigorous requirements management. Furthermore, special solutions for management of source code in distributed development teams are needed. The build-process and testing activities need to be conducted in a systematic manner. The generation and provision of different licensing models need to be mastered and finally the issue of security needs to be addressed for any product that can be networked---which by the way is a strategic target of nearly any product developing company. Application Lifecycle Management (ALM) covers many of the above-mentioned issues. IT solutions for ALM are comparable to traditional PLM solutions, but focus particularly on software as a product. Thus, these systems have become widely used by software companies in the same manner as PLM solutions belong to the standard enterprise IT environment of companies developing physical products. With software penetrating traditional physical products, product managers, product developers, manufacturing staff etc. need to work with both, PLM and ALM, since neither solution is able to cover both domains sufficiently. However, ALM and PLM solutions feature redundant functionality. Thus, best practices for the systematic integration of ALM and PLM are required."}],"editor":[{"first_name":"John","full_name":"Stark, John","last_name":"Stark"}],"date_updated":"2025-06-26T13:40:03Z","year":"2019","user_id":"83781","date_created":"2022-04-25T10:46:14Z","language":[{"iso":"eng"}]},{"publication_identifier":{"issn":["2351-9789"]},"publication_status":"published","title":"Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study","department":[{"_id":"DEP7022"},{"_id":"DEP1306"}],"doi":"10.1016/j.promfg.2018.06.020","publication":"4th International Conference on System-Integrated Intelligence - Intelligent, Flexible and Connected Systems in Products and Production","conference":{"name":"4th International Conference on System-Integrated Intelligence - Intelligent, Flexible and Connected Systems in Products and Production","end_date":"20218-06-20","location":"Hannover","start_date":"2018-06-19"},"keyword":["Product lifecycle management","Application Lifecycle Management","Smart products","Systems engineering"],"citation":{"ieee":"A. Deuter, A. Otte, M. Ebert, and F. Possel-Dölken, <i>Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study</i>, vol. 24. Amsterdam [u.a.]: Elsevier BV, 2018, pp. 107–113. doi: <a href=\"https://doi.org/10.1016/j.promfg.2018.06.020\">10.1016/j.promfg.2018.06.020</a>.","van":"Deuter A, Otte A, Ebert M, Possel-Dölken F. Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study. Denkena B, Thoben KD, Trachtler A, editors. 4th International Conference on System-Integrated Intelligence - Intelligent, Flexible and Connected Systems in Products and Production. Amsterdam [u.a.]: Elsevier BV; 2018. (Procedia Manufacturing; vol. 24).","havard":"A. Deuter, A. Otte, M. Ebert, F. Possel-Dölken, Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study, Elsevier BV, Amsterdam [u.a.], 2018.","ufg":"<b>Deuter, Andreas u. a.</b>: Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study, Bd. 24, hg. von Denkena, B./Thoben, K.D./Trachtler, A., Amsterdam [u.a.] 2018 (Procedia Manufacturing).","ama":"Deuter A, Otte A, Ebert M, Possel-Dölken F. <i>Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study</i>. Vol 24. (Denkena B, Thoben KD, Trachtler A, eds.). Elsevier BV; 2018:107-113. doi:<a href=\"https://doi.org/10.1016/j.promfg.2018.06.020\">10.1016/j.promfg.2018.06.020</a>","apa":"Deuter, A., Otte, A., Ebert, M., &#38; Possel-Dölken, F. (2018). Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study. In B. Denkena, K. D. Thoben, &#38; A. Trachtler (Eds.), <i>4th International Conference on System-Integrated Intelligence - Intelligent, Flexible and Connected Systems in Products and Production</i> (Vol. 24, pp. 107–113). Elsevier BV. <a href=\"https://doi.org/10.1016/j.promfg.2018.06.020\">https://doi.org/10.1016/j.promfg.2018.06.020</a>","bjps":"<b>Deuter A <i>et al.</i></b> (2018) <i>Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study</i>, Denkena B, Thoben KD and Trachtler A (eds). Amsterdam [u.a.]: Elsevier BV.","chicago-de":"Deuter, Andreas, Andreas Otte, Marcel Ebert und Frank Possel-Dölken. 2018. <i>Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study</i>. Hg. von B. Denkena, K. D.  Thoben, und A. Trachtler. <i>4th International Conference on System-Integrated Intelligence - Intelligent, Flexible and Connected Systems in Products and Production</i>. Bd. 24. Procedia Manufacturing. Amsterdam [u.a.]: Elsevier BV. doi:<a href=\"https://doi.org/10.1016/j.promfg.2018.06.020\">10.1016/j.promfg.2018.06.020</a>, .","mla":"Deuter, Andreas, et al. “Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study.” <i>4th International Conference on System-Integrated Intelligence - Intelligent, Flexible and Connected Systems in Products and Production</i>, edited by B. Denkena et al., vol. 24, Elsevier BV, 2018, pp. 107–13, <a href=\"https://doi.org/10.1016/j.promfg.2018.06.020\">https://doi.org/10.1016/j.promfg.2018.06.020</a>.","chicago":"Deuter, Andreas, Andreas Otte, Marcel Ebert, and Frank Possel-Dölken. <i>Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study</i>. Edited by B. Denkena, K. D.  Thoben, and A. Trachtler. <i>4th International Conference on System-Integrated Intelligence - Intelligent, Flexible and Connected Systems in Products and Production</i>. Vol. 24. Procedia Manufacturing. Amsterdam [u.a.]: Elsevier BV, 2018. <a href=\"https://doi.org/10.1016/j.promfg.2018.06.020\">https://doi.org/10.1016/j.promfg.2018.06.020</a>.","short":"A. Deuter, A. Otte, M. Ebert, F. Possel-Dölken, Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study, Elsevier BV, Amsterdam [u.a.], 2018.","din1505-2-1":"<span style=\"font-variant:small-caps;\">Deuter, Andreas</span> ; <span style=\"font-variant:small-caps;\">Otte, Andreas</span> ; <span style=\"font-variant:small-caps;\">Ebert, Marcel</span> ; <span style=\"font-variant:small-caps;\">Possel-Dölken, Frank</span> ; <span style=\"font-variant:small-caps;\">Denkena, B.</span> ; <span style=\"font-variant:small-caps;\">Thoben, K. D.</span> ; <span style=\"font-variant:small-caps;\">Trachtler, A.</span> (Hrsg.): <i>Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study</i>, <i>Procedia Manufacturing</i>. Bd. 24. Amsterdam [u.a.] : Elsevier BV, 2018"},"publisher":"Elsevier BV","series_title":"Procedia Manufacturing","intvolume":"        24","language":[{"iso":"eng"}],"date_created":"2025-04-15T12:50:25Z","user_id":"83781","date_updated":"2025-06-26T13:39:42Z","year":"2018","editor":[{"first_name":"B.","full_name":"Denkena, B.","last_name":"Denkena"},{"first_name":"K. D. ","last_name":"Thoben","full_name":"Thoben, K. D. "},{"first_name":"A.","last_name":"Trachtler","full_name":"Trachtler, A."}],"abstract":[{"text":"The digitization of the industry requires smart products and services. Smart products are mechatronic products with an increasing amount of software. To get high quality smart products to the market quickly, manufacturers need to reshape their product lifecycle processes. They need to apply system engineering-based methods to enable smooth cross-domain developments with a special focus on the software domain. One significant challenge faced by manufacturers is the harmonization of product lifecycle management (PLM), which addresses the hardware lifecycle, with application lifecycle management (ALM), which addresses the software lifecycle.\r\n\r\nTo support manufacturers in this challenging activity, this paper demonstrates a proven process for developing use cases and requirements associated with a PLM/ALM integration. This process has been elicited during an industrial case study in a manufacturing company. This paper explains this process in detail. A generally applicable approach for developing the requirements of a PLM/ALM integration is extracted by removing the company-specific factors. ","lang":"eng"}],"_id":"12798","type":"conference_editor_article","page":"107-113","volume":24,"author":[{"first_name":"Andreas","orcid":"0000-0002-6529-6215","id":"62088","full_name":"Deuter, Andreas","last_name":"Deuter"},{"first_name":"Andreas","last_name":"Otte","full_name":"Otte, Andreas","id":"51466"},{"first_name":"Marcel","full_name":"Ebert, Marcel","last_name":"Ebert"},{"full_name":"Possel-Dölken, Frank","last_name":"Possel-Dölken","first_name":"Frank"}],"status":"public","place":"Amsterdam [u.a.]"}]
