@inproceedings{617,
  abstract     = {{The production of high quality, customer-oriented but equally competitive products should encourage the manufacturers of construction materials to ensure that the non value-adding activities are continuously reduced within production. Against
this background, an approach was developed, based on a combination of static value stream mapping and dynamic simulation. By means of a pilot study from a company of the construction materials industry, the developed approach is presented.}},
  author       = {{Börkircher, Mikko and Gamber, Thilo Gerhard}},
  booktitle    = {{Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7. und 8. Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010.}},
  editor       = {{Zülch, G.}},
  isbn         = {{978-3-86644-558-1}},
  keywords     = {{Simulation, Automobilindustrie, Digitale Fabrik, Logistiksysteme, Bauindustrie}},
  location     = {{Karlsruhe}},
  number       = {{1}},
  pages        = {{405--412}},
  publisher    = {{KIT}},
  title        = {{{Simulationsunterstütztes Wertstromdesign: Ansatz zur Steigerung des Wertschöpfungspotenzials in der Baustoffindustrie}}},
  doi          = {{ DOI: 10.5445/KSP/1000019635 }},
  year         = {{2010}},
}

