@misc{7147,
  abstract     = {{Purpose: Industry 4.0 technologies influence how production is planned, scheduled, and controlled. In literature, different classifications of the tasks and functions of production planning and control (PPC) exist, of which one is the German Aachen PPC model. This research aims to identify and classify current Industry 4.0 approaches for planning and controlling production processes and to reveal researched and unexplored areas of the model.

Design/methodology/approach: In an exploratory literature review, we review and classify 48 publications on a full-text basis with the Aachen PPC model's tasks and functions. Two cluster analyses reveal researched and unexplored tasks and functions of the Aachen PPC model. Additionally, we give a summary of each reviewed publication.

Findings: We propose a cyber-physical PPC architecture, which incorporates current Industry 4.0 technologies, current optimization methods, optimization objectives, and disturbances relevant for realizing a PPC system in a smart factory. Current approaches focus on the in-house PPC, particularly on the control using real-time information from the shop floor. We propose future research directions for the unexplored tasks and functions of the Aachen PPC model.

Research limitations/implications: The selection of search terms and the texts' interpretation is based on an individual assessment. The revelation of unexplored tasks and functions of the Aachen PPC model might have a different outcome if the search term combination is parameterized differently.

Originality/value: Using the Aachen PPC model, which holistically models PPC, the findings give comprehensive insights into the current advances of tools, methods, and challenges relevant to planning and controlling production processes under Industry 4.0.}},
  author       = {{Herrmann, Jan-Phillip and Tackenberg, Sven and Padoano, Elio and Gamber, Thilo}},
  booktitle    = {{Journal of Industrial Engineering and Management}},
  issn         = {{2013-0953}},
  keywords     = {{Production planning and control, Industry 4.0, Industrial Internet of Things, Exploratory literature review}},
  number       = {{1}},
  publisher    = {{ OmniaScience}},
  title        = {{{Approaches of production planning and control under industry 4.0: A literature review}}},
  doi          = {{http://dx.doi.org/10.3926/jiem.3582}},
  volume       = {{15}},
  year         = {{2022}},
}

@article{7033,
  abstract     = {{Industry 4.0 technologies influence how production is planned, scheduled, and controlled. In literature, different classifications of the tasks and functions of production planning and control (PPC) exist, of which one is the German Aachen PPC model. This paper conducts an exploratory literature review by reviewing 48 publications on a full-text basis. Based on the review, a cyber-physical PPC architecture is proposed, which incorporates current Industry 4.0 technologies, current optimisation methods, optimisation objectives, and disturbances, relevant for the realisation of a PPC system in a smart factory. A classification scheme is developed as a basis for two cluster analyses that reveal researched and unexplored tasks and functions of the Aachen PPC model. Current approaches focus on the in-house PPC, particularly on the control using real-time information from the shop floor. Future research directions are proposed for the unexplored tasks and functions of the Aachen PPC model.}},
  author       = {{Herrmann, Jan-Phillip and Tackenberg, Sven and Padoano, Elio and Gamber, Thilo}},
  issn         = {{1877-0509}},
  journal      = {{Procedia Computer Science}},
  keywords     = {{Production planning, control, Industry 4.0, Industrial Internet of Things, Exploratory literature review}},
  pages        = {{208--218}},
  publisher    = {{Elsevier}},
  title        = {{{A literature review and cluster analysis of the Aachen production planning and control model under Industry 4.0}}},
  doi          = {{10.1016/j.procs.2021.01.158}},
  volume       = {{180}},
  year         = {{2021}},
}

@inproceedings{7024,
  abstract     = {{Empirische Untersuchungen haben gezeigt, dass das Verursachen von Fehlern und das Erleben von Fehlerkonsequenzen eine effektive Lerngelegenheit darstellen (Harteis, Bauer & Gruber, 2008, Kapur, 2015). Daher wird ein Lernsystem für die gewerblich-technische Berufsbildung entwickelt, welches auf der Simulation von bestehenden Arbeitsprozessen basiert und die Repräsentation von aus menschlichen Handlungen resultierenden Fehlerkonsequenzen ermöglicht. Während der Nutzung des Systems arbeiten Lernende an einem realen Arbeitsplatz und können schwerwiegende, negative Handlungsfolgen statt in der Realität in AR erfahren. Die Fehlerkonsequenzen werden Lernenden durch die Integration einer Augmented-Reality-Anwendung (AR) visualisiert. Dieser Beitrag behandelt die technische Umsetzbarkeit eines solchen AR-Lernsystems. Hierzu wird ein eigens entwickelter Use-Case herangezogen, welcher eine realitätsnahe Arbeitsaufgabe abbildet.}},
  author       = {{Kobelt, Dennis and Goppold, M. and Atanasyan, A. and Herrmann, Jan-Phillip and Tackenberg, Sven and Frenz, M. and Gamber, Thilo}},
  booktitle    = {{Gemeinschaften in Neuen Medien : Von hybriden Realitäten zu hybriden Gemeinschaften}},
  editor       = {{Köhler, Thomas and Schoop, Eric and Kahnwald, Nina}},
  isbn         = {{978-3-95908-21-1}},
  location     = {{Dresden}},
  pages        = {{126 -- 132}},
  publisher    = {{TUDpress}},
  title        = {{{Use-Case Studie eines auf der Nutzung von Handlungsfehlern basierenden AR-Lernsystems zur kritischen Reflexion der technischen Umsetzbarkeit}}},
  year         = {{2020}},
}

@inproceedings{7025,
  abstract     = {{Petri-Netze ermöglichen die Abbildung von menschlichen Fehlern innerhalb von Handlungen. Handlungen bilden die Ereignisse der zugrundeliegenden Arbeitssysteme und können auch durch entsprechende digitale Zwillinge beschrieben werden. Im Beitrag werden Module eines Petri-Netzes vorgestellt, mit denen sich fehlerfreie und fehlerhafte Handlungen sowie die daraus resultierenden Fehlerkonsequenzen beschreiben lassen. Die Module sowie deren Funktionsweise wird anhand eines Beispiels erläutert und diskutiert.}},
  author       = {{Kobelt, Dennis and Herrmann, Jan-Phillip and Tackenberg, Sven and Gamber, Thilo}},
  booktitle    = {{Digitaler Wandel, digitale Arbeit, digitaler Mensch? : Bericht zum 66. Frühjahrskongress der Gesellschaft für Arbeitswissenschaft e. V. (GfA)}},
  location     = {{Berlin}},
  publisher    = {{GfA Press}},
  title        = {{{Petri-Netz Architekturen zur Modellierung von menschlichen Fehlern und Fehlerauswirkungen in Arbeitsprozessen}}},
  year         = {{2020}},
}

@inproceedings{7028,
  abstract     = {{Das Angebot komplementärer Weiterbildungsmaßnahmen für Studierende des Industrial Engineerings (IE) an der Technischen Hochschule Ostwestfalen-Lippe (TH-OWL) ist in der Vergangenheit weiter ausgebaut worden. Dennoch wird das Angebot nur von einem Teil der Studierenden wahrgenommen. Um der Frage nach den Ursachen nachzugehen ist eine Befragung durchgeführt worden. Der Bedarf sowie die Einschätzung des Aufwands in Geld und Zeit für einen Abschluss der komplementären Weiterbildungsmaßnahmen sind ermittelt worden. Aus den Ergebnissen kann abgeleitet werden, dass die Studierenden unsicher in der Einschätzung des Aufwands sind. Im Durchschnitt wird eine niedrigere Bereitschaft des im Augenblick festgelegten Aufwandes (Geld, Zeit) zur Erlangung eines Abschlusses einer der Weiterbildungsmaßnahmen angegeben.}},
  author       = {{Herrmann, Jan-Phillip and Gamber, Thilo}},
  booktitle    = {{Digitaler Wandel, digitale Arbeit, digitaler Mensch? : Bericht zum 66. Frühjahrskongress der Gesellschaft für Arbeitswissenschaft e. V. (GfA)}},
  isbn         = {{978-3-936804-27-0}},
  location     = {{Berlin}},
  publisher    = {{GfA Press}},
  title        = {{{Bedarfsforschung zu komplementären Weiterbildungsmaßnahmen im Bereich Industrial Engineering an Hochschulen}}},
  volume       = {{35}},
  year         = {{2020}},
}

@inproceedings{7038,
  author       = {{Goppold, Marvin and Tackenberg, Sven and Atanasyan, Alexander and Cichon, Torben and Kobelt, Dennis and Gamber, Thilo}},
  booktitle    = {{Gemeinschaften in neuen Medien : Erforschung der digitalen Transformation in Wissenschaft, Wirtschaft, Bildung und öffentlicher Verwaltung}},
  editor       = {{Köhler, Thomas and Schoop, Eric and Kahnwald, Nina}},
  location     = {{Dresden}},
  pages        = {{12 -- 23}},
  publisher    = {{TUDpress}},
  title        = {{{Systemkonzept und Modellierung beruflicher Handlungen im FeDiNAR-AR-Lernsystem}}},
  year         = {{2019}},
}

@inbook{807,
  abstract     = {{Die digitale Transformation von Unternehmen erfordert von allen beteiligten Akteuren grundlegende Neuorientierungen. Das gilt auch und im besonderen Maße für Betriebsräte. Sie sehen sich bei der Heraus-bildung neuer Formen und Strukturen digitaler Arbeit vor neue Aufgaben einer mehr vorausschauenden statt nachsorgenden Mitgestaltung und Mitbestimmung gestellt. Eine an den Menschen orientierte und von ihnen mitgestaltete digitale Arbeitswelt erfordert Betriebsräte, die auf Augenhöhe mit dem Management agieren können. Die Anforderungen von Betriebsrä-ten an ihr zukünftiges Kompetenzprofil „Betriebsrat 4.0“ werden durch eine schriftliche Umfrage und vertiefende Interviews erfasst. Die vorhandenen Kompetenzen, die zusätzlichen Qualifizierungsbedarfe und die bestehen-den Angebote werden miteinander abgeglichen, um ggf. relevante Ange-botslücken möglichst passgenau zu identifizieren und schließen zu können. Ein entsprechendes Qualifizierungsprogramm wird entwickelt und implementiert. }},
  author       = {{Gamber, Thilo Gerhard and Dietrich, Oliver and Nettelstroth, Wolfgang}},
  booktitle    = {{Arbeit interdisziplinär analysieren - bewerten - gestalten. Bericht zum 65. Frühjahrskongress der Gesellschaft für Arbeitswissenschaft e. V. (GfA)}},
  isbn         = {{978-3-936804-25-6}},
  location     = {{Dreden}},
  publisher    = {{GFA Press}},
  title        = {{{Betriebsrat 4.0: Ermittlung des Qualifizierungsbedarfs für Betriebsräte in Ostwestfalen-Lippe}}},
  year         = {{2019}},
}

@inproceedings{685,
  author       = {{Gamber, Thilo Gerhard and Zülch, Gert}},
  booktitle    = {{2018 Winter Simulation Conference, WSC 2018, Gothenburg, Sweden, December 9-12, 2018}},
  editor       = {{Rabe, M. and Juan, A.A. and Mustafee, N. and Skoogh, A.  and Jain, S. and Johansson, B.}},
  location     = {{Gothenburg, Sweden}},
  pages        = {{977--988}},
  title        = {{{Approach to Improve the Work-Life Balance of Employees Using Agent-Based Planning and Simulation-Based Evaluation}}},
  doi          = {{10.1109/WSC.2018.8632260}},
  year         = {{2018}},
}

@inproceedings{686,
  abstract     = {{A high level of productivity for current and future services is a critical success factor for companies. When the productivity of services is unknown or incorrect, resources are wasted and opportunities are missed. To respond to this challenge, a simulation modelfor the prospective description of a complex service provision was developed in order to support companies to create a robust offering of services.Focusing on the domain of factory planning, we illustrate howan extended Stochastic Resource-Constrained Project Scheduling Problem(SRCPSP) can be applied for developing proposals. The presented validation study confirms that the approach is capable to calculate and optimize the planning objectives when developing a service for complex engineering projects}},
  author       = {{Tackenberg, Sven and Duckwitz, Sönke and Gamber, Thilo Gerhard}},
  booktitle    = {{Production Engineering and Management}},
  editor       = {{Villmer, Franz-Josef and Padoano, Elio}},
  isbn         = {{978-3-946856-03-0}},
  keywords     = {{SRCPSP, Simulation, Petri Nets, Proposal development}},
  location     = {{Lemgo}},
  number       = {{1}},
  pages        = {{271--281}},
  title        = {{{Robust Planning of the Provision of complex Services}}},
  year         = {{2018}},
}

@inproceedings{240,
  abstract     = {{Projekte, gerade im IT-Bereich, werden heutzutage gleichermaßen mit internen Mitarbeitern sowie externen Spezialisten (sog. IT-Freelancern) besetzt. Eine sehr fachkundige Planungsperson stößt bei der Aufgabe, IT-Fachkräfte den Projekten zuzuordnen, in der sich schnell wandelnden IT-Welt an ihre Grenzen. An dieser Stelle setzt das duale Planungsverfahren iCombine Project Pad an. Beim Durchlauf des 9-stufigen Planungsverfahrens werden die zu bearbeitenden Aufgaben durch eine eigens für diesen Zweck entwickelte Software unterstützt.}},
  author       = {{Freytag, R. and Schentke, R. and Gamber, Thilo Gerhard}},
  booktitle    = {{Dokumentation des 64. Arbeitswissenschaftlichen Kongresses FOM Hochschule für Oekonomie & Management 21.02.-23.02.2018}},
  location     = {{Frankfurt am Main}},
  publisher    = {{GFA Press}},
  title        = {{{Kompetenzmanagement in der Digitalisierung das Verfahren iCombine Project Pad}}},
  year         = {{2018}},
}

@inbook{808,
  abstract     = {{Projekte, gerade im IT-Bereich, werden heutzutage gleichermaßen mit internen Mitarbeitern sowie externen Spezialisten (sog. IT-Freelancern) besetzt. Eine sehr fachkundige Planungsperson stößt bei der Aufgabe, IT-Fachkräfte den Projekten zuzuordnen, in der sich schnell wandelnden IT-Welt an ihre Grenzen. An dieser Stelle setzt das duale Planungsverfahren iCombine Project Pad an. Beim Durchlauf des 9-stufigen Planungsverfahrens werden die zu bearbeitenden Aufgaben durch eine eigens für diesen Zweck entwickelte Software unterstützt.}},
  author       = {{Freytag, R. and Schentke, R. and Gamber, Thilo Gerhard}},
  booktitle    = {{ARBEIT(s).WISSEN.SCHAF(f)T – Grundlage für Management & Kompetenzentwicklung}},
  publisher    = {{GFA Press}},
  title        = {{{Kompetenzmanagement in der Digitalisierung das Verfahren iCombine Project Pad}}},
  year         = {{2018}},
}

@inproceedings{649,
  author       = {{Gamber, Thilo Gerhard and Hrdina, J.}},
  booktitle    = {{Arbeit in komplexen Systemen - digital, vernetzt, human?! 62. Kongress der Gesellschaft für Arbeitswissenschaft }},
  isbn         = {{978-3-936804-20-1}},
  location     = {{Aachen}},
  pages        = {{-- -- --}},
  publisher    = {{GfA-Press}},
  title        = {{{Standards, Tools und Projektmanagement im Industrial Engineering - eine Organisationsentwicklungsmaßnahme der Continental AG}}},
  year         = {{2016}},
}

@phdthesis{421,
  abstract     = {{Es wird ein agentenbasiertes Planungsverfahren vorgestellt, das die Vereinbarkeit von Berufs- und Privatleben des Personals besser als bisher gewährleisten soll. Dabei wird durch eine Verbesserung der Einsatzzeitplanung sowohl den individuellen Präferenzen des Personals als auch einer fairen Berücksichtigung der Arbeitszeitwünsche Rechnung getragen. Hinsichtlich der betrieblichen Anforderungen und deren Erfüllung durch die geplanten Einsatzzeiten des Personals erfolgt eine dynamische Bewertung der Arbeitsabläufe mit Hilfe der personalorientierten Simulation.

Dissertation am Institut für Arbeitswissenschaft und Betriebsorganisation (Karlsruhe): Forschungsberichte aus dem Institut für Arbeitswissenschaft und Betriebsorganisation der Universität Karlsruhe ; Bd. 44}},
  author       = {{Gamber, Thilo Gerhard}},
  isbn         = {{978-3-8440-3518-6}},
  keywords     = {{Arbeitszeitgestaltung, Personaleinsatz, Simulation}},
  pages        = {{289}},
  publisher    = {{Shaker Verlag}},
  title        = {{{Entwicklung eines Verfahrens zur agentenbasierten Einsatzzeitgestaltung}}},
  year         = {{2015}},
}

@inproceedings{422,
  author       = {{Gamber, Thilo Gerhard and Zülch, Gert}},
  booktitle    = {{Simulation in production and logistics 2015}},
  editor       = {{Rabe, Markus and Clausen, Uwe}},
  isbn         = {{978-3-8396-0936-1}},
  keywords     = {{Produktion, Logistik, Simulation}},
  location     = {{Dortmund}},
  pages        = {{711--720}},
  publisher    = {{Fraunhofer Verlag}},
  title        = {{{Agentenbasierte Planung und simulationsunterstützte Bewertung praferenzorientierter Einsatzzeiten des Personals }}},
  year         = {{2015}},
}

@inproceedings{427,
  abstract     = {{Für Länder mit hohen Lohnkosten eignen sich aus wirtschaftlichen Gründen hauptsächlich hochautomatisierte Montagekonzepte. Für Niedriglohnländer hybride oder ausschließlich manuelle Montagesysteme. Ein ideales Montagekonzept ist so gestaltet, dass es durch wandlungsfähige Eigenschaften beide Ländertypen mit wenig Änderungsaufwand abdecken kann. Der Beitrag behandelt Möglichkeiten und Ansätze, um solch ein wandlungsfähiges, hybrides Montagesystem zu gestalten und erläutert die Realisierung ausgewählter Methoden an einem hybriden Montagesystem der Continental AG.}},
  author       = {{Hrdina, Jan and Gamber, Thilo Gerhard}},
  booktitle    = {{ Verantwortung für die Arbeit der Zukunft, Frühjahrskongress der Gesellschaft für Arbeitswissenschaft}},
  isbn         = {{978-3-936804-18-8}},
  keywords     = {{hybrides System, Montagesystem, Niedriglohnland, Montagekonzept, hybrides Montagesystem}},
  location     = {{Karlsruhe}},
  publisher    = {{GfA-Press}},
  title        = {{{Einsatz von Methoden der Wandlungsfähigkeit bei einem hybriden Montagesystem}}},
  year         = {{2015}},
}

@inproceedings{667,
  author       = {{Hrdina, T. and Jonas, P. and Gamber, Thilo Gerhard}},
  booktitle    = {{Gestaltung der Arbeitswelt der Zukunft : 60. Kongress der Gesellschaft für Arbeitswissenschaft }},
  isbn         = {{978-3-936804-17-1}},
  location     = {{München}},
  number       = {{1}},
  pages        = {{375--377}},
  publisher    = {{GfA-Press}},
  title        = {{{Verbesserung des Arbeitsablaufes eines hybriden Montagesystems mit Hilfe der Simulation}}},
  year         = {{2014}},
}

@inproceedings{452,
  abstract     = {{With regards to methods of assembly systems planning we are familiar
with the depiction of the technical structure using capacity fields and capacity
graphs in addition to the modelling of assembly activities as a precedence diagrams.
However, no form of presentation has yet been defined that describes the assignment
of staff within an assembly system. This paper discusses the concept of the so called
staff assignment graph used to balance a hybrid assembly system, and in doing so
marks a first attempt to close this gap and to develop a more comprehensive
planning method. The paper also explains how to evaluate staff assignment graphs,
as well as how to automatically derive them from corresponding capacity graphs.}},
  author       = {{Gamber, Thilo Gerhard and Leupold, M. and Zülch, G.}},
  booktitle    = {{Simulation in Produktion und Logistik. Entscheidungsunterstützung von der Planung bis zur Steuerung}},
  editor       = {{Dangelmaier, Wilhelm and Laroque, Christoph and Klaas, Alexander}},
  isbn         = {{978-3-942647-35-9}},
  location     = {{Paderborn}},
  pages        = {{315--324}},
  title        = {{{Leistungsabstimmung von Montagsystemen auf der Basis von Personaleinsatzgraphen}}},
  year         = {{2013}},
}

@inproceedings{453,
  author       = {{Gamber, Thilo Gerhard and Zülch, G.}},
  booktitle    = {{Chancen durch Arbeits-, Produkt- und Systemgestaltung : Zukunftsfähigkeit für Produktions- und Dienstleistungsunternehmen}},
  editor       = {{Schütte, Martin}},
  isbn         = {{9783936804140}},
  location     = {{Krefeld}},
  pages        = {{589--592}},
  publisher    = {{GfA-Press}},
  title        = {{{Präferenzorientierte Planung und Simulation von Arbeitsschichten}}},
  year         = {{2013}},
}

@inproceedings{455,
  author       = {{Hrdina, J. and Eisenbarth, M. and Gamber, Thilo Gerhard}},
  booktitle    = {{Chancen durch Arbeits-, Produkt- und Systemgestaltung : Zukunftsfähigkeit für Produktions- und Dienstleistungsunternehmen}},
  editor       = {{Schütte, Martin}},
  isbn         = {{9783936804140}},
  location     = {{Krefeld}},
  pages        = {{505--508}},
  publisher    = {{GfA-Press}},
  title        = {{{Arbeitsgestaltung eines Produktionssystems für die Montage elektronischer Bremssysteme im globalen Wettbewerb}}},
  year         = {{2013}},
}

@article{456,
  abstract     = {{Die Herstellkosten eines Produktes werden durch Materialkosten und 
Fertigungskosten bestimmt, Fertigungskosten insbesondere durch 
Betriebsmittelkosten (Abschreibungen) und Personalkosten (Fertigungslöhne). 
Der  Fachbeitrag  beschreibt  eine  Vorgehensweise  zur  Darstellung  von  Montagekosten  zum  Vergleich  von  unterschiedlichen  Montagesystemen  an  weltweiten  Standorten.  Diese  Darstellung  hat 
sich  in  der  betrieblichen  Praxis  als  hilfreich  erwiesen,  um Verbesserungsnotwendigkeiten aufzuzeigen. }},
  author       = {{Hrdina, J. and Gamber, Thilo Gerhard and Eisenbarth, M.}},
  issn         = {{1436-4980}},
  journal      = {{wt Werkstatttechnik online}},
  number       = {{9}},
  pages        = {{672--678}},
  title        = {{{Darstellung von Zielkosten für Montagesysteme . Abbildung von Kostenverläufen zum Aufzeigen von Verbesserungsbedarfen}}},
  year         = {{2013}},
}

@inbook{612,
  author       = {{Freytag, R. and Gamber, Thilo Gerhard}},
  booktitle    = {{Arbeitszeitgestaltung im Krankenhaus  - Tagungsunterlagen zum Workshop im Rahmen des Forschungsvorhabens "Vereinbarkeit von Berufs- und Privatleben durch Gestaltung Sozialverträglicher Arbeitszeiten"}},
  editor       = {{Zülch, G. and Graichen, S. and Stock, P.}},
  isbn         = {{978-3-9812620-2-5}},
  pages        = {{34--53}},
  publisher    = {{Karlsruher Institut für Technologie, Institut für Arbeitswissenschaft und Betriebsorganisation}},
  title        = {{{Koordination von Arbeitszeitverhandlungen mittels Agentensysteme}}},
  year         = {{2012}},
}

@inbook{613,
  author       = {{Gamber, Thilo Gerhard and Zülch, G.}},
  booktitle    = {{Advances in social and organizational factors}},
  editor       = {{Vink, P.}},
  pages        = {{424--433}},
  publisher    = {{CRC Press}},
  title        = {{{Agent-Based Planning and Simulation-Based Assessment Approach to Improve the Work-Life Balance of Hospital Staff}}},
  year         = {{2012}},
}

@inbook{614,
  author       = {{Zülch, G. and Gamber, Thilo Gerhard}},
  booktitle    = {{Arbeitszeitgestaltung im Krankenhaus}},
  editor       = {{Zülch, G. and Graichen, S. and Stock, P.}},
  isbn         = {{978-3-9812620-2-5}},
  pages        = {{14--33}},
  publisher    = {{Karlsruher Institut für Technologie, Institut für Arbeitswissenschaft und Betriebsorganisation}},
  title        = {{{Vereinbarkeit von Berufs- und Privatleben durch Gestaltung sozialverträglicher Arbeitszeiten – dargestellt am Beispiel des Krankenhausbereiches}}},
  year         = {{2012}},
}

@inbook{615,
  author       = {{Zülch, G. and Leupold, M. and Gamber, Thilo Gerhard}},
  booktitle    = {{Advances in Production Management Systems}},
  editor       = {{Frick, J. and Laugen, B.}},
  isbn         = {{978-3-642-33979-0}},
  pages        = {{157--164}},
  publisher    = {{Springer}},
  title        = {{{The Staff Assignment Graph - Planning, Evaluating and Improving Personnel Deployment in Assembly Systems}}},
  year         = {{2012}},
}

@inproceedings{616,
  author       = {{Gamber, Thilo Gerhard and Zülch, G.}},
  booktitle    = {{2012 AHFE International Conference}},
  isbn         = {{0-9796435-5-4}},
  location     = {{San Francisco}},
  pages        = {{4263--4272}},
  publisher    = {{USA Publishing}},
  title        = {{{Agent-Based Planning and Simulation-Based Assessment Approach to Improve the Work-Life Balance of Hospital Staff}}},
  year         = {{2012}},
}

@inbook{640,
  author       = {{Gamber, Thilo Gerhard and Zülch, G.}},
  booktitle    = {{Advances in Human Factors and Ergonomics 2012}},
  editor       = {{Salvendy, G. and Karwowski, W.}},
  isbn         = {{146655262X}},
  location     = {{San Francisco}},
  pages        = {{4263--4272}},
  publisher    = {{Taylor & Francis}},
  title        = {{{Agent-Based Planning and Simulation-Based Assessment Approach to Improve the Work-Life Balance of Hospital Staff}}},
  volume       = {{14}},
  year         = {{2012}},
}

@inproceedings{458,
  abstract     = {{Hospitals have to ensure continuous medical monitoring and care. Therefore, they have to be staffed 7 days a week for 24 hours. However, this may lead to conflicts between work and private lives of the employees. To reduce these conflicts, this research deals with the organization of socially acceptable working times. In order to improve an existing working time configuration, an agent-based approach has been developed. Within this approach, several optimization strategies have been implemented. To prove the efficiency of the developed approach, new key figures (e.g. rate of satisfaction) have been developed. In addition, a personnel-oriented simulation procedure is used which allows for a realistic modelling of hospital departments and for a comprehensive evaluation of solutions with approved key figures in a multi-criteria way. The inter-linkage between optimization approach and simulation tool will be demonstrated. Furthermore, the functionality and the experimental setup of the approach will be presented.}},
  author       = {{Gamber, Thilo Gerhard}},
  booktitle    = {{Proceedings of the 2011 Winter Simulation Conference}},
  editor       = {{Sanjay, Jain}},
  isbn         = {{9781457721083}},
  location     = {{Phoenix}},
  publisher    = {{IEEE}},
  title        = {{{Compatibility of Work and Private Life through Socially Acceptable Working Time Configuration}}},
  year         = {{2011}},
}

@inproceedings{461,
  author       = {{Zülch, G. and Gamber, Thilo Gerhard}},
  booktitle    = {{Healthcare Systems Ergonomics and Patient Safety 2011}},
  editor       = {{Albolino, Sara and Bagnara, Sebastiano and Bellandi, Tommaso and Llaneza, Javier and Rosal-Lopez, Gustavo and Tartaglia, Riccardo}},
  isbn         = {{9780415684132}},
  location     = {{Oviedo}},
  pages        = {{255--256}},
  publisher    = {{CRC Press}},
  title        = {{{Agent-Based Planning and Evaluation of Working Times in Hospitals . An Alliance Between Professionals and Citizens for Patient Safety and Quality of Life}}},
  year         = {{2011}},
}

@inproceedings{462,
  author       = {{Zülch, G. and Gamber, Thilo Gerhard and Leupold, M.}},
  booktitle    = {{Advances in Production Management Systems. Value Networks: Innovation, Technologies, and Management}},
  editor       = {{Frick, Jan and Timenes, Bjorge}},
  isbn         = {{978-3-642-33980-6}},
  location     = {{Stavanger}},
  pages        = {{157--164}},
  publisher    = {{Springer}},
  title        = {{{The Staff Assignment Graph - A New Approach for Production Systems Planning}}},
  year         = {{2011}},
}

@inproceedings{464,
  author       = {{Zülch, G. and Gamber, Thilo Gerhard and Freytag, R.}},
  booktitle    = {{Healthcare Systems Ergonomics and Patient Safety 2011: . An Alliance between Professionals and citizens for Patient safety and Quality of Life}},
  editor       = {{Albolino, Sara and Bagnara, Sebastiano and Bellandi, Tommaso and Llaneza, Javier and Rosal-Lopez, Gustavo and Tartaglia, Riccardo}},
  isbn         = {{9780415684132}},
  location     = {{Oviedo}},
  pages        = {{291--295}},
  publisher    = {{CRC Press}},
  title        = {{{Improving the Work Life Balance of Hospital Staff Through an Agent-Based Rostering Procedure}}},
  year         = {{2011}},
}

@inproceedings{617,
  abstract     = {{The production of high quality, customer-oriented but equally competitive products should encourage the manufacturers of construction materials to ensure that the non value-adding activities are continuously reduced within production. Against
this background, an approach was developed, based on a combination of static value stream mapping and dynamic simulation. By means of a pilot study from a company of the construction materials industry, the developed approach is presented.}},
  author       = {{Börkircher, Mikko and Gamber, Thilo Gerhard}},
  booktitle    = {{Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7. und 8. Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010.}},
  editor       = {{Zülch, G.}},
  isbn         = {{978-3-86644-558-1}},
  keywords     = {{Simulation, Automobilindustrie, Digitale Fabrik, Logistiksysteme, Bauindustrie}},
  location     = {{Karlsruhe}},
  number       = {{1}},
  pages        = {{405--412}},
  publisher    = {{KIT}},
  title        = {{{Simulationsunterstütztes Wertstromdesign: Ansatz zur Steigerung des Wertschöpfungspotenzials in der Baustoffindustrie}}},
  doi          = {{ DOI: 10.5445/KSP/1000019635 }},
  year         = {{2010}},
}

@inproceedings{618,
  author       = {{Gamber, Thilo Gerhard and Börkircher, Mikko and Zülch, Gert}},
  booktitle    = {{Neue Arbeits- und Lebenswelten gestalten : vom 24. - 26. März 2010 }},
  editor       = {{Schütte, Martin }},
  isbn         = {{978-3-936804-08-9}},
  location     = {{Darmstadt}},
  pages        = {{409--412}},
  publisher    = {{GfA-Press }},
  title        = {{{Vereinbarkeit von Berufs- und Privatleben im Krankenhausbereich durch Gestaltung sozialverträglicher Arbeitszeiten}}},
  year         = {{2010}},
}

@inproceedings{620,
  author       = {{Gamber, Thilo Gerhard and Zülch, Gert}},
  booktitle    = {{Integrationsaspekte der Simulation: Technik, Organisation und Personal}},
  editor       = {{Zülch, Gert and Patricia, Stock}},
  isbn         = {{978-3-86644-558-1}},
  location     = {{Karsruhe}},
  number       = {{1}},
  pages        = {{373--380}},
  publisher    = {{KIT}},
  title        = {{{Agentenbasierte Planung und Simulation der Arbeitszeitgestaltung in Krankenhäusern}}},
  year         = {{2010}},
}

@inbook{621,
  author       = {{Gamber, Thilo Gerhard and Börkircher, Mikka}},
  booktitle    = {{Mittelpunkt Mensch.}},
  pages        = {{227--247}},
  publisher    = {{VS Verlag für Sozialwissenschaften / GWV Fachverlage GmbH}},
  title        = {{{Vereinbarkeit von Familien- und Berufsleben bei der Gestaltung flexibler Arbeitszeiten}}},
  year         = {{2010}},
}

@inproceedings{469,
  abstract     = {{Production  scheduling  has attracted  the  interest  of  production  economics  communities  for  decades,  
but there is still  a  gap between academic research, real -world problems, operations research and  simulation.  Genetic  Algorithms  (GA) represent a technique that has already been applied to a variety of combinatorial problems. 
Simulation can be used to find a solution to problems through repetitive simulation runs or to prove a solution 
computed by an optimization algorithm. We will explain the  application of two special GAs for job -shop and resource-
constrained  project scheduling  problems trying  to bridge the gap between problem  solving  by  algorithm  
and by simulation. Possible goals for scheduling  problems are to minimize the makespan of a production program or to increase the due -date reliability of jobs or possibly any goal which can be described in a mathematical expression. The approach focuses on integrating a GA into a commercial software product and verifying the results with simulation.}},
  author       = {{Zülch, Gert and Steininger, Peter and Gamber, Thilo Gerhard and Leupold, Miachael}},
  booktitle    = {{Proceedings of the 2009 Winter Simulation Conference; Energy Alternatives}},
  editor       = {{Rossetti, M.D. and Hill, R.R. and Johansson, B. and Dunkin, A. and Ingalls, R.G.}},
  isbn         = {{9781424457700}},
  location     = {{New York}},
  pages        = {{2238--2249}},
  title        = {{{Generating, Benchmarking and Simulating Production Schedules – From Formalisation to Real Problems}}},
  year         = {{2009}},
}

@article{622,
  abstract     = {{The objective of this paper is to depict the knowledge array of standards. This is done by identifying and analyzing external effects, specifically spillover effects. The database used is Perinorm. We use a cluster analysis in order to create groups of technology fields for German standards according to the fields of the International Classification of Standards. Methodologically, the distances between these objects or clusters are defined by the chosen distance measure, which in turn is determined by the sum of their cross references. The applied joining clustering method uses these distances between the objects and allows the data to be mapped within a two dimensional space. The results of this mapping show the existence of structures within the standards data fitting to the well-known structure of patent spillovers.}},
  author       = {{Gamber, Thilo Gerhard and Friedrich-Nishio, MNonika and Grupp, Hariolf}},
  issn         = {{1588-2861}},
  journal      = {{Scientometrics}},
  keywords     = {{Total Factor Productivity, Technological Progress, Spillover Effect, Knowledge Spillover, European Standard}},
  number       = {{1}},
  pages        = {{89--108}},
  publisher    = {{Springer}},
  title        = {{{Science and Technology in Standardization: a Statistical Analysis of Merging Knowledge Structures}}},
  doi          = {{https://doi.org/10.1007/s11192-008-0105-4}},
  volume       = {{74}},
  year         = {{2008}},
}

@inproceedings{625,
  author       = {{Zülch, Gert and Stock, P. and Hrdina, J. and Gamber, Thilo Gerhard}},
  booktitle    = {{Arbeitsgestaltung für KMU : 10. - 11. September 2008 an der TU Ilmenau }},
  isbn         = {{ 	978-3-938843-39-0}},
  location     = {{Ilmenau}},
  number       = {{1}},
  pages        = {{51--58}},
  publisher    = {{ISLE - Ilmenau : Univ.-Bibliothek der TU }},
  title        = {{{Arbeitszeitgestaltung mit Hilfe der Simulation}}},
  year         = {{2008}},
}

@inbook{475,
  abstract     = {{Agentenbasierter Ansatz zur Modellierung und Simulation persönlicher Präferenzen, beispielhaft aufgezeigt am Krankenhausbereich

Trotz der allgemein relativ hohen Arbeitslosigkeit in unserer Gesellschaft stellt sich die Beschäftigungssituation in bestimmten Berufsgruppen anders dar: Hier besteht ein Mangel an Arbeitskräften, der im Laufe der Zeit noch zunehmen wird. Dies bedeutet, dass Arbeitnehmer, die bereits beruflich überlastet sind, immer noch mehr Arbeit leisten müssen.}},
  author       = {{Gamber, Thilo Gerhard and Börkircher, Mikko}},
  booktitle    = {{Mittelpunkt Mensch}},
  isbn         = {{978-3-531-15716-0}},
  pages        = {{227--247}},
  publisher    = {{VS Verlag für Sozialwissenschaften}},
  title        = {{{Vereinbarkeit von Familien- und Berufsleben bei der Gestaltung flexibler Arbeitszeiten}}},
  year         = {{2008}},
}

@inbook{477,
  author       = {{Gamber, Thilo Gerhard and Friedrich-Nishio, M.}},
  booktitle    = {{The Entrepreneurship-Innovation-Marketing Interface}},
  editor       = {{Würth, Reinhold and Gaul, W.}},
  isbn         = {{978-3-89929-120-9}},
  pages        = {{231--255}},
  publisher    = {{Swiridoff Verlag}},
  title        = {{{Analyse zur Verflechtung der Technik anhand von Verweisen zwischen Normungsdokumenten mit Hilfe der Datenbank Perinorm}}},
  year         = {{2007}},
}

@inproceedings{484,
  author       = {{Zülch, Gert and Gamber, Thilo Gerhard and Stock, Patricia}},
  booktitle    = {{Simulation und Visualisierung 2007 (SimVis 2007)}},
  editor       = {{Schulze, T. and Preim, B. and Schumann, H.}},
  location     = {{Magedeburg}},
  pages        = {{97--110}},
  publisher    = {{SCS Publishing House}},
  title        = {{{Analyse von Entscheidungssystemen im Fertigungsbereich mittels Simulation}}},
  year         = {{2007}},
}

@inproceedings{486,
  abstract     = {{Growing market demands on enterprises and the resulting challenges for their organization have been discussed for many years now. The flexibilty and mutability of an enterprise are thereby considered as a significant factor for success.}},
  author       = {{Zülch, Gert and Gamber, Thilo Gerhard and Stock, Patricia}},
  booktitle    = {{Advances in Production Management Systems}},
  editor       = {{Olhager, Jan and Persson, Fredrik}},
  isbn         = {{978-0-387-74157-4}},
  keywords     = {{production planning and control, decision-making system, personnel-oriented simulation}},
  location     = {{Linköping}},
  pages        = {{337--344}},
  publisher    = {{Springer}},
  title        = {{{Methodology for the Analysis of Simulation-Based Decision-Making in the Manufacturing Area}}},
  year         = {{2007}},
}

@book{487,
  editor       = {{Zülch, Gert and Stock, P. and Hrdina, J. and Gamber, Thilo Gerhard}},
  isbn         = {{978-3-00-021634-3 }},
  location     = {{Karlsruhe}},
  pages        = {{153}},
  publisher    = {{Ifab}},
  title        = {{{Erfolgsfaktor Arbeitszeit im Krankenhaus : Tagungsunterlagen zum Workshop im Rahmen des DFG-Projektes "Prozessoptimierung und effizienter Personaleinsatz im Krankenhausbereich - Gestaltung flexibler Arbeitszeitmodelle mit Hilfe der personalorientierten Simulation"}}},
  year         = {{2007}},
}

@inbook{626,
  author       = {{Gamber, Thilo Gerhard and Zülch, G.}},
  booktitle    = {{Operations Research}},
  pages        = {{255}},
  publisher    = {{Universität}},
  title        = {{{Methodology for the Analysis of Simulation-Based Decision-Making in the Production Area}}},
  year         = {{2006}},
}

