<?xml version="1.0" encoding="UTF-8"?>

<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3">

<genre>conference paper</genre>

<titleInfo><title>Generating, Benchmarking and Simulating Production Schedules – From Formalisation to Real Problems</title></titleInfo>


<note type="publicationStatus">published</note>




<name type="personal">
  <namePart type="given">Gert</namePart>
  <namePart type="family">Zülch</namePart>
  <role><roleTerm type="text">author</roleTerm> </role></name>
<name type="personal">
  <namePart type="given">Peter</namePart>
  <namePart type="family">Steininger</namePart>
  <role><roleTerm type="text">author</roleTerm> </role></name>
<name type="personal">
  <namePart type="given">Thilo Gerhard</namePart>
  <namePart type="family">Gamber</namePart>
  <role><roleTerm type="text">author</roleTerm> </role><identifier type="local">71451</identifier></name>
<name type="personal">
  <namePart type="given">Miachael</namePart>
  <namePart type="family">Leupold</namePart>
  <role><roleTerm type="text">author</roleTerm> </role></name>



<name type="personal"><namePart type="given">M.D.</namePart><namePart type="family">Rossetti</namePart>
  <role> <roleTerm type="text">editor</roleTerm> </role></name>
<name type="personal"><namePart type="given">R.R.</namePart><namePart type="family">Hill</namePart>
  <role> <roleTerm type="text">editor</roleTerm> </role></name>
<name type="personal"><namePart type="given">B.</namePart><namePart type="family">Johansson</namePart>
  <role> <roleTerm type="text">editor</roleTerm> </role></name>
<name type="personal"><namePart type="given">A.</namePart><namePart type="family">Dunkin</namePart>
  <role> <roleTerm type="text">editor</roleTerm> </role></name>
<name type="personal"><namePart type="given">R.G.</namePart><namePart type="family">Ingalls</namePart>
  <role> <roleTerm type="text">editor</roleTerm> </role></name>






<name type="conference">
  <namePart>2009 Winter Simulation Conference; Energy Alternatives</namePart>
</name>






<abstract lang="eng">Production  scheduling  has attracted  the  interest  of  production  economics  communities  for  decades,  
but there is still  a  gap between academic research, real -world problems, operations research and  simulation.  Genetic  Algorithms  (GA) represent a technique that has already been applied to a variety of combinatorial problems. 
Simulation can be used to find a solution to problems through repetitive simulation runs or to prove a solution 
computed by an optimization algorithm. We will explain the  application of two special GAs for job -shop and resource-
constrained  project scheduling  problems trying  to bridge the gap between problem  solving  by  algorithm  
and by simulation. Possible goals for scheduling  problems are to minimize the makespan of a production program or to increase the due -date reliability of jobs or possibly any goal which can be described in a mathematical expression. The approach focuses on integrating a GA into a commercial software product and verifying the results with simulation.</abstract>

<originInfo><dateIssued encoding="w3cdtf">2009</dateIssued><place><placeTerm type="text">New York</placeTerm></place>
</originInfo>
<language><languageTerm authority="iso639-2b" type="code">eng</languageTerm>
</language>



<relatedItem type="host"><titleInfo><title>Proceedings of the 2009 Winter Simulation Conference; Energy Alternatives</title></titleInfo>
  <identifier type="isbn">9781424457700</identifier>
<part><extent unit="pages">2238-2249</extent>
</part>
</relatedItem>


<relatedItem type="Supplementary material">
  <location>
  
     <url>https://www.informs-sim.org/wsc09papers/216.pdf</url>
  
  </location>
</relatedItem>
<note type="extern">yes</note>
<extension>
<bibliographicCitation>
<din1505-2-1>&lt;span style=&quot;font-variant:small-caps;&quot;&gt;Zülch, Gert&lt;/span&gt; ; &lt;span style=&quot;font-variant:small-caps;&quot;&gt;Steininger, Peter&lt;/span&gt; ; &lt;span style=&quot;font-variant:small-caps;&quot;&gt;Gamber, Thilo Gerhard&lt;/span&gt; ; &lt;span style=&quot;font-variant:small-caps;&quot;&gt;Leupold, Miachael&lt;/span&gt;: Generating, Benchmarking and Simulating Production Schedules – From Formalisation to Real Problems. In: &lt;span style=&quot;font-variant:small-caps;&quot;&gt;Rossetti, M. D.&lt;/span&gt; ; &lt;span style=&quot;font-variant:small-caps;&quot;&gt;Hill, R. R.&lt;/span&gt; ; &lt;span style=&quot;font-variant:small-caps;&quot;&gt;Johansson, B.&lt;/span&gt; ; &lt;span style=&quot;font-variant:small-caps;&quot;&gt;Dunkin, A.&lt;/span&gt; ; &lt;span style=&quot;font-variant:small-caps;&quot;&gt;Ingalls, R. G.&lt;/span&gt; (Hrsg.): &lt;i&gt;Proceedings of the 2009 Winter Simulation Conference; Energy Alternatives&lt;/i&gt;, 2009, S. 2238–2249</din1505-2-1>
<chicago-de>Zülch, Gert, Peter Steininger, Thilo Gerhard Gamber und Miachael Leupold. 2009. Generating, Benchmarking and Simulating Production Schedules – From Formalisation to Real Problems. In: &lt;i&gt;Proceedings of the 2009 Winter Simulation Conference; Energy Alternatives&lt;/i&gt;, hg. von M.D. Rossetti, R.R. Hill, B. Johansson, A. Dunkin, und R.G. Ingalls, 2238–2249.</chicago-de>
<chicago>Zülch, Gert, Peter Steininger, Thilo Gerhard Gamber, and Miachael Leupold. “Generating, Benchmarking and Simulating Production Schedules – From Formalisation to Real Problems.” In &lt;i&gt;Proceedings of the 2009 Winter Simulation Conference; Energy Alternatives&lt;/i&gt;, edited by M.D. Rossetti, R.R. Hill, B. Johansson, A. Dunkin, and R.G. Ingalls, 2238–49, 2009.</chicago>
<mla>Zülch, Gert, et al. “Generating, Benchmarking and Simulating Production Schedules – From Formalisation to Real Problems.” &lt;i&gt;Proceedings of the 2009 Winter Simulation Conference; Energy Alternatives&lt;/i&gt;, edited by M.D. Rossetti et al., 2009, pp. 2238–49.</mla>
<short>G. Zülch, P. Steininger, T.G. Gamber, M. Leupold, in: M.D. Rossetti, R.R. Hill, B. Johansson, A. Dunkin, R.G. Ingalls (Eds.), Proceedings of the 2009 Winter Simulation Conference; Energy Alternatives, 2009, pp. 2238–2249.</short>
<havard>G. Zülch, P. Steininger, T.G. Gamber, M. Leupold, Generating, Benchmarking and Simulating Production Schedules – From Formalisation to Real Problems, in: M.D. Rossetti, R.R. Hill, B. Johansson, A. Dunkin, R.G. Ingalls (Eds.), Proceedings of the 2009 Winter Simulation Conference; Energy Alternatives, 2009: pp. 2238–2249.</havard>
<bjps>&lt;b&gt;Zülch G &lt;i&gt;et al.&lt;/i&gt;&lt;/b&gt; (2009) Generating, Benchmarking and Simulating Production Schedules – From Formalisation to Real Problems. In Rossetti MD et al. (eds), &lt;i&gt;Proceedings of the 2009 Winter Simulation Conference; Energy Alternatives&lt;/i&gt;. pp. 2238–2249.</bjps>
<ieee>G. Zülch, P. Steininger, T. G. Gamber, and M. Leupold, “Generating, Benchmarking and Simulating Production Schedules – From Formalisation to Real Problems,” in &lt;i&gt;Proceedings of the 2009 Winter Simulation Conference; Energy Alternatives&lt;/i&gt;, New York, 2009, pp. 2238–2249.</ieee>
<ufg>&lt;b&gt;Zülch, Gert et. al. (2009)&lt;/b&gt;: Generating, Benchmarking and Simulating Production Schedules – From Formalisation to Real Problems, in: M.D. Rossetti et. al. (Hgg.): &lt;i&gt;Proceedings of the 2009 Winter Simulation Conference; Energy Alternatives&lt;/i&gt;, S. 2238–2249.</ufg>
<ama>Zülch G, Steininger P, Gamber TG, Leupold M. Generating, Benchmarking and Simulating Production Schedules – From Formalisation to Real Problems. In: Rossetti MD, Hill RR, Johansson B, Dunkin A, Ingalls RG, eds. &lt;i&gt;Proceedings of the 2009 Winter Simulation Conference; Energy Alternatives&lt;/i&gt;. ; 2009:2238-2249.</ama>
<van>Zülch G, Steininger P, Gamber TG, Leupold M. Generating, Benchmarking and Simulating Production Schedules – From Formalisation to Real Problems. In: Rossetti MD, Hill RR, Johansson B, Dunkin A, Ingalls RG, editors. Proceedings of the 2009 Winter Simulation Conference; Energy Alternatives. 2009. p. 2238–49.</van>
<apa>Zülch, G., Steininger, P., Gamber, T. G., &amp;#38; Leupold, M. (2009). Generating, Benchmarking and Simulating Production Schedules – From Formalisation to Real Problems. In M. D. Rossetti, R. R. Hill, B. Johansson, A. Dunkin, &amp;#38; R. G. Ingalls (Eds.), &lt;i&gt;Proceedings of the 2009 Winter Simulation Conference; Energy Alternatives&lt;/i&gt; (pp. 2238–2249). New York.</apa>
</bibliographicCitation>
</extension>
<recordInfo><recordIdentifier>469</recordIdentifier><recordCreationDate encoding="w3cdtf">2019-01-23T15:15:56Z</recordCreationDate><recordChangeDate encoding="w3cdtf">2023-03-15T13:49:55Z</recordChangeDate>
</recordInfo>
</mods>
</modsCollection>
