{"date_updated":"2023-04-14T11:37:27Z","year":"2016","date_created":"2019-02-18T15:23:42Z","conference":{"start_date":"2016-09-29","location":"Lemgo","end_date":"2016-09-30","name":"Proceedings 6th International Conference"},"editor":[{"last_name":"Villmer","full_name":"Villmer, Franz-Josef","first_name":"Franz-Josef"},{"last_name":"Padoano","full_name":"Padoano, Elio","first_name":"Elio"}],"type":"conference","status":"public","oa":"1","_id":"590","abstract":[{"text":"Against the background of rising overhead costs in manufacturing companies the application of methods of overhead cost management is of increasing importance. Within this article existing approaches of cost management are explained in principle. Based on these approaches a new complementary approach of managing costs with the help of costs elasticity ratios is described by a case study. The method is based on the hypothesis that there are no fixed personnel costs, but personnel costs with different elasticity with respect to the volume of orders. Personnel costs elasticity (ε) is derived from the quotient of the relative change in personnel costs (k) and the relative change of the order volume (q) of a billing month (i). The method aims to increase the flexibility of overhead costs, but can also be applied with respect to so-called direct costs. In this case, the question arises as to what extent the direct costs actually develop proportional elastic over time.","lang":"eng"}],"user_id":"49010","file_date_updated":"2023-04-14T11:36:14Z","title":"How Elasticity Indicators Support Cost Management","publication":"Production Engineering and Management","file":[{"file_id":"9701","content_type":"application/pdf","relation":"main_file","file_name":"PEM 2016 paper Hinrichsen final.pdf","creator":"mqc-p4h","success":1,"date_created":"2023-04-14T11:36:14Z","file_size":130007,"date_updated":"2023-04-14T11:36:14Z","access_level":"open_access"}],"department":[{"_id":"DEP1306"},{"_id":"DEP7020"}],"page":"123-131","ddc":["330"],"keyword":["Cost management","Overhead costs","Direct costs","Labor costs","Elasticity"],"language":[{"iso":"eng"}],"place":"Lemgo","publication_status":"published","author":[{"first_name":"Sven","id":"49010","full_name":"Hinrichsen, Sven","last_name":"Hinrichsen"}],"issue":"1","has_accepted_license":"1","corporate_editor":["Department of Production Engineering and Management","Hochschule Ostwestfalen-Lippe"],"citation":{"mla":"Hinrichsen, Sven. “How Elasticity Indicators Support Cost Management.” Production Engineering and Management, edited by Franz-Josef Villmer et al., no. 1, 2016, pp. 123–31.","din1505-2-1":"Hinrichsen, Sven: How Elasticity Indicators Support Cost Management. In: Villmer, F.-J. ; Padoano, E. ; Department of Production Engineering and Management ; Hochschule Ostwestfalen-Lippe (Hrsg.): Production Engineering and Management. Lemgo, 2016, S. 123–131","chicago-de":"Hinrichsen, Sven. 2016. How Elasticity Indicators Support Cost Management. In: Production Engineering and Management, hg. von Franz-Josef Villmer, Elio Padoano, Department of Production Engineering and Management, und Hochschule Ostwestfalen-Lippe, 123–131. Lemgo.","chicago":"Hinrichsen, Sven. “How Elasticity Indicators Support Cost Management.” In Production Engineering and Management, edited by Franz-Josef Villmer, Elio Padoano, Department of Production Engineering and Management, and Hochschule Ostwestfalen-Lippe, 123–31. Lemgo, 2016.","short":"S. Hinrichsen, in: F.-J. Villmer, E. Padoano, Department of Production Engineering and Management, Hochschule Ostwestfalen-Lippe (Eds.), Production Engineering and Management, Lemgo, 2016, pp. 123–131.","ieee":"S. Hinrichsen, “How Elasticity Indicators Support Cost Management,” in Production Engineering and Management, Lemgo, 2016, no. 1, pp. 123–131.","ufg":"Hinrichsen, Sven: How Elasticity Indicators Support Cost Management, in: Villmer, Franz-Josef u. a. (Hgg.): Production Engineering and Management, Lemgo 2016, S. 123–131.","bjps":"Hinrichsen S (2016) How Elasticity Indicators Support Cost Management. In Villmer F-J et al. (eds), Production Engineering and Management. Lemgo, pp. 123–131.","van":"Hinrichsen S. How Elasticity Indicators Support Cost Management. In: Villmer FJ, Padoano E, Department of Production Engineering and Management, Hochschule Ostwestfalen-Lippe, editors. Production Engineering and Management. Lemgo; 2016. p. 123–31.","havard":"S. Hinrichsen, How Elasticity Indicators Support Cost Management, in: F.-J. Villmer, E. Padoano, Department of Production Engineering and Management, Hochschule Ostwestfalen-Lippe (Eds.), Production Engineering and Management, Lemgo, 2016: pp. 123–131.","apa":"Hinrichsen, S. (2016). How Elasticity Indicators Support Cost Management. In F.-J. Villmer, E. Padoano, Department of Production Engineering and Management, & Hochschule Ostwestfalen-Lippe (Eds.), Production Engineering and Management (Issue 1, pp. 123–131).","ama":"Hinrichsen S. How Elasticity Indicators Support Cost Management. In: Villmer FJ, Padoano E, Department of Production Engineering and Management, Hochschule Ostwestfalen-Lippe, eds. Production Engineering and Management. ; 2016:123-131."},"publication_identifier":{"isbn":["978-3-946856-00-9"]}}