{"publication":"Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7. und 8. Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010.","page":"405-412","user_id":"74004","title":"Simulationsunterstütztes Wertstromdesign: Ansatz zur Steigerung des Wertschöpfungspotenzials in der Baustoffindustrie","main_file_link":[{"open_access":"1","url":"https://publikationen.bibliothek.kit.edu/1000019635"}],"type":"conference","status":"public","doi":" DOI: 10.5445/KSP/1000019635 ","editor":[{"first_name":"G.","last_name":"Zülch","full_name":"Zülch, G."}],"_id":"617","abstract":[{"lang":"eng","text":"The production of high quality, customer-oriented but equally competitive products should encourage the manufacturers of construction materials to ensure that the non value-adding activities are continuously reduced within production. Against\r\nthis background, an approach was developed, based on a combination of static value stream mapping and dynamic simulation. By means of a pilot study from a company of the construction materials industry, the developed approach is presented."}],"oa":"1","year":2010,"date_updated":"2023-03-15T13:50:04Z","date_created":"2019-03-04T12:48:22Z","conference":{"start_date":"2010-10-07","end_date":"2010-10-08","location":"Karlsruhe","name":"Integrationsaspekte der Simulation: Technik, Orgnisation und Personal"},"publication_identifier":{"isbn":["978-3-86644-558-1"]},"citation":{"apa":"Börkircher, M., & Gamber, T. G. (2010). Simulationsunterstütztes Wertstromdesign: Ansatz zur Steigerung des Wertschöpfungspotenzials in der Baustoffindustrie. In G. Zülch & Institut für Arbeitswissenschaft und Betriebsorganisation (IFAB) (Eds.), Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7. und 8. Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010. (pp. 405–412). Karlsruhe: KIT. https://doi.org/ DOI: 10.5445/KSP/1000019635 ","ama":"Börkircher M, Gamber TG. Simulationsunterstütztes Wertstromdesign: Ansatz zur Steigerung des Wertschöpfungspotenzials in der Baustoffindustrie. In: Zülch G, Institut für Arbeitswissenschaft und Betriebsorganisation (IFAB), eds. Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7. und 8. Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010. Karlsruhe: KIT; 2010:405-412. doi: DOI: 10.5445/KSP/1000019635 ","short":"M. Börkircher, T.G. Gamber, in: G. Zülch, Institut für Arbeitswissenschaft und Betriebsorganisation (IFAB) (Eds.), Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7. und 8. Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010., KIT, Karlsruhe, 2010, pp. 405–412.","ieee":"M. Börkircher and T. G. Gamber, “Simulationsunterstütztes Wertstromdesign: Ansatz zur Steigerung des Wertschöpfungspotenzials in der Baustoffindustrie,” in Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7. und 8. Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010., Karlsruhe, 2010, no. 1, pp. 405–412.","ufg":"Börkircher, Mikko/Gamber, Thilo Gerhard (2010): Simulationsunterstütztes Wertstromdesign: Ansatz zur Steigerung des Wertschöpfungspotenzials in der Baustoffindustrie, in: G. Zülch/Institut für Arbeitswissenschaft und Betriebsorganisation (IFAB) (Hgg.): Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7. und 8. Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010., Karlsruhe, S. 405–412.","bjps":"Börkircher M and Gamber TG (2010) Simulationsunterstütztes Wertstromdesign: Ansatz zur Steigerung des Wertschöpfungspotenzials in der Baustoffindustrie. In Zülch G and Institut für Arbeitswissenschaft und Betriebsorganisation (IFAB) (eds), Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7. und 8. Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010. Karlsruhe: KIT, pp. 405–412.","van":"Börkircher M, Gamber TG. Simulationsunterstütztes Wertstromdesign: Ansatz zur Steigerung des Wertschöpfungspotenzials in der Baustoffindustrie. In: Zülch G, Institut für Arbeitswissenschaft und Betriebsorganisation (IFAB), editors. Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7 und 8 Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010. Karlsruhe: KIT; 2010. p. 405–12.","havard":"M. Börkircher, T.G. Gamber, Simulationsunterstütztes Wertstromdesign: Ansatz zur Steigerung des Wertschöpfungspotenzials in der Baustoffindustrie, in: G. Zülch, Institut für Arbeitswissenschaft und Betriebsorganisation (IFAB) (Eds.), Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7. und 8. Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010., KIT, Karlsruhe, 2010: pp. 405–412.","din1505-2-1":"Börkircher, Mikko ; Gamber, Thilo Gerhard: Simulationsunterstütztes Wertstromdesign: Ansatz zur Steigerung des Wertschöpfungspotenzials in der Baustoffindustrie. In: Zülch, G. ; Institut für Arbeitswissenschaft und Betriebsorganisation (IFAB) (Hrsg.): Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7. und 8. Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010.. Karlsruhe : KIT, 2010, S. 405–412","chicago-de":"Börkircher, Mikko und Thilo Gerhard Gamber. 2010. Simulationsunterstütztes Wertstromdesign: Ansatz zur Steigerung des Wertschöpfungspotenzials in der Baustoffindustrie. In: Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7. und 8. Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010., hg. von G. Zülch und Institut für Arbeitswissenschaft und Betriebsorganisation (IFAB), 405–412. Karlsruhe: KIT. doi: DOI: 10.5445/KSP/1000019635 , .","chicago":"Börkircher, Mikko, and Thilo Gerhard Gamber. “Simulationsunterstütztes Wertstromdesign: Ansatz zur Steigerung des Wertschöpfungspotenzials in der Baustoffindustrie.” In Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7. und 8. Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010., edited by G. Zülch and Institut für Arbeitswissenschaft und Betriebsorganisation (IFAB), 405–12. Karlsruhe: KIT, 2010. https://doi.org/ DOI: 10.5445/KSP/1000019635 .","mla":"Börkircher, Mikko, and Thilo Gerhard Gamber. “Simulationsunterstütztes Wertstromdesign: Ansatz zur Steigerung des Wertschöpfungspotenzials in der Baustoffindustrie.” Integrationsaspekte der Simulation: Technik, Orgnisation und Personal, Karlsruhe, 7. und 8. Oktober 2010 = Integration Aspects of Simulation: Equipment, Organization and Personnell, Karlsruhe, 7th and 8th October 2010., edited by G. Zülch and Institut für Arbeitswissenschaft und Betriebsorganisation (IFAB), no. 1, KIT, 2010, pp. 405–12, doi: DOI: 10.5445/KSP/1000019635 ."},"extern":"1","issue":"1","corporate_editor":["Institut für Arbeitswissenschaft und Betriebsorganisation (IFAB)"],"place":"Karlsruhe","author":[{"first_name":"Mikko","full_name":"Börkircher, Mikko","last_name":"Börkircher"},{"first_name":"Thilo Gerhard","full_name":"Gamber, Thilo Gerhard","last_name":"Gamber","id":"71451"}],"publication_status":"published","language":[{"iso":"ger"}],"keyword":["Simulation","Automobilindustrie","Digitale Fabrik","Logistiksysteme","Bauindustrie"],"publisher":"KIT"}