<?xml version="1.0" encoding="UTF-8"?>

<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3">

<genre>conference paper</genre>

<titleInfo><title>Forecasting Method for Estimation of Labor Times in Complex Projects illustrated by a Factory Planning Case Study</title></titleInfo>


<note type="publicationStatus">published</note>




<name type="personal">
  <namePart type="given">Sven</namePart>
  <namePart type="family">Hinrichsen</namePart>
  <role><roleTerm type="text">author</roleTerm> </role><identifier type="local">49010</identifier></name>
<name type="personal">
  <namePart type="given">Christopher Marc</namePart>
  <namePart type="family">Schlick</namePart>
  <role><roleTerm type="text">author</roleTerm> </role></name>
<name type="personal">
  <namePart type="given">Peter</namePart>
  <namePart type="family">Steiger</namePart>
  <role><roleTerm type="text">author</roleTerm> </role></name>
<name type="personal">
  <namePart type="given">Hubert</namePart>
  <namePart type="family">Wurz</namePart>
  <role><roleTerm type="text">author</roleTerm> </role></name>







<name type="corporate">
  <namePart></namePart>
  <identifier type="local">DEP7020</identifier>
  <role>
    <roleTerm type="text">department</roleTerm>
  </role>
</name>



<name type="conference">
  <namePart>Annual conference and expo. Institute of Industrial Engineers (IIE); 2008; Vancouver Industrial Engineering Research Conference; 2008; Vancouver IERC; 2008; Vancouver </namePart>
</name>







<originInfo><publisher>Institute of Industrial Engineers </publisher><dateIssued encoding="w3cdtf">2008</dateIssued><place><placeTerm type="text">Vancouver</placeTerm></place>
</originInfo>
<language><languageTerm authority="iso639-2b" type="code">eng</languageTerm>
</language>



<relatedItem type="host"><titleInfo><title>How business take flight : IIE annual conference and expo 2008, May 17 - 21, The Westin Bayshore, Vancouver, B.C., Canada ; conference proceedings ; [including] 2008 Industrial Engineering Research Conference</title></titleInfo>
<part><detail type="issue"><number>1</number></detail><extent unit="pages">643-648</extent>
</part>
</relatedItem>

<note type="extern">yes</note>
<extension>
<bibliographicCitation>
<apa>Hinrichsen, S., Schlick, C. M., Steiger, P., &amp;#38; Wurz, H. (2008). Forecasting Method for Estimation of Labor Times in Complex Projects illustrated by a Factory Planning Case Study. In  Institute of Industrial Engineers, USA  (Ed.), &lt;i&gt;How business take flight : IIE annual conference and expo 2008, May 17 - 21, The Westin Bayshore, Vancouver, B.C., Canada ; conference proceedings ; [including] 2008 Industrial Engineering Research Conference&lt;/i&gt; (pp. 643–648). Norcross, Ga. : Institute of Industrial Engineers .</apa>
<bjps>&lt;b&gt;Hinrichsen S &lt;i&gt;et al.&lt;/i&gt;&lt;/b&gt; (2008) Forecasting Method for Estimation of Labor Times in Complex Projects Illustrated by a Factory Planning Case Study. In  Institute of Industrial Engineers, USA  (ed.), &lt;i&gt;How Business Take Flight : IIE Annual Conference and Expo 2008, May 17 - 21, The Westin Bayshore, Vancouver, B.C., Canada ; Conference Proceedings ; [Including] 2008 Industrial Engineering Research Conference&lt;/i&gt;. Norcross, Ga. : Institute of Industrial Engineers , pp. 643–648.</bjps>
<chicago>Hinrichsen, Sven, Christopher Marc Schlick, Peter Steiger, and Hubert Wurz. “Forecasting Method for Estimation of Labor Times in Complex Projects Illustrated by a Factory Planning Case Study.” In &lt;i&gt;How Business Take Flight : IIE Annual Conference and Expo 2008, May 17 - 21, The Westin Bayshore, Vancouver, B.C., Canada ; Conference Proceedings ; [Including] 2008 Industrial Engineering Research Conference&lt;/i&gt;, edited by  Institute of Industrial Engineers, USA , 643–48. Norcross, Ga. : Institute of Industrial Engineers , 2008.</chicago>
<din1505-2-1>&lt;span style=&quot;font-variant:small-caps;&quot;&gt;Hinrichsen, Sven&lt;/span&gt; ; &lt;span style=&quot;font-variant:small-caps;&quot;&gt;Schlick, Christopher Marc&lt;/span&gt; ; &lt;span style=&quot;font-variant:small-caps;&quot;&gt;Steiger, Peter&lt;/span&gt; ; &lt;span style=&quot;font-variant:small-caps;&quot;&gt;Wurz, Hubert&lt;/span&gt;: Forecasting Method for Estimation of Labor Times in Complex Projects illustrated by a Factory Planning Case Study. In: &lt;span style=&quot;font-variant:small-caps;&quot;&gt; Institute of Industrial Engineers, USA &lt;/span&gt; (Hrsg.): &lt;i&gt;How business take flight : IIE annual conference and expo 2008, May 17 - 21, The Westin Bayshore, Vancouver, B.C., Canada ; conference proceedings ; [including] 2008 Industrial Engineering Research Conference&lt;/i&gt;. Norcross, Ga.  : Institute of Industrial Engineers , 2008, S. 643–648</din1505-2-1>
<ufg>&lt;b&gt;Hinrichsen, Sven et. al. (2008)&lt;/b&gt;: Forecasting Method for Estimation of Labor Times in Complex Projects illustrated by a Factory Planning Case Study, in:  Institute of Industrial Engineers, USA  (Hg.): &lt;i&gt;How business take flight : IIE annual conference and expo 2008, May 17 - 21, The Westin Bayshore, Vancouver, B.C., Canada ; conference proceedings ; [including] 2008 Industrial Engineering Research Conference&lt;/i&gt;, Norcross, Ga. , S. 643–648.</ufg>
<short>S. Hinrichsen, C.M. Schlick, P. Steiger, H. Wurz, in:  Institute of Industrial Engineers, USA  (Ed.), How Business Take Flight : IIE Annual Conference and Expo 2008, May 17 - 21, The Westin Bayshore, Vancouver, B.C., Canada ; Conference Proceedings ; [Including] 2008 Industrial Engineering Research Conference, Institute of Industrial Engineers , Norcross, Ga. , 2008, pp. 643–648.</short>
<ieee>S. Hinrichsen, C. M. Schlick, P. Steiger, and H. Wurz, “Forecasting Method for Estimation of Labor Times in Complex Projects illustrated by a Factory Planning Case Study,” in &lt;i&gt;How business take flight : IIE annual conference and expo 2008, May 17 - 21, The Westin Bayshore, Vancouver, B.C., Canada ; conference proceedings ; [including] 2008 Industrial Engineering Research Conference&lt;/i&gt;, Vancouver, 2008, no. 1, pp. 643–648.</ieee>
<ama>Hinrichsen S, Schlick CM, Steiger P, Wurz H. Forecasting Method for Estimation of Labor Times in Complex Projects illustrated by a Factory Planning Case Study. In:  Institute of Industrial Engineers, USA , ed. &lt;i&gt;How Business Take Flight : IIE Annual Conference and Expo 2008, May 17 - 21, The Westin Bayshore, Vancouver, B.C., Canada ; Conference Proceedings ; [Including] 2008 Industrial Engineering Research Conference&lt;/i&gt;. Norcross, Ga. : Institute of Industrial Engineers ; 2008:643-648.</ama>
<chicago-de>Hinrichsen, Sven, Christopher Marc Schlick, Peter Steiger und Hubert Wurz. 2008. Forecasting Method for Estimation of Labor Times in Complex Projects illustrated by a Factory Planning Case Study. In: &lt;i&gt;How business take flight : IIE annual conference and expo 2008, May 17 - 21, The Westin Bayshore, Vancouver, B.C., Canada ; conference proceedings ; [including] 2008 Industrial Engineering Research Conference&lt;/i&gt;, hg. von  Institute of Industrial Engineers, USA , 643–648. Norcross, Ga. : Institute of Industrial Engineers .</chicago-de>
<mla>Hinrichsen, Sven, et al. “Forecasting Method for Estimation of Labor Times in Complex Projects Illustrated by a Factory Planning Case Study.” &lt;i&gt;How Business Take Flight : IIE Annual Conference and Expo 2008, May 17 - 21, The Westin Bayshore, Vancouver, B.C., Canada ; Conference Proceedings ; [Including] 2008 Industrial Engineering Research Conference&lt;/i&gt;, edited by  Institute of Industrial Engineers, USA , no. 1, Institute of Industrial Engineers , 2008, pp. 643–48.</mla>
<van>Hinrichsen S, Schlick CM, Steiger P, Wurz H. Forecasting Method for Estimation of Labor Times in Complex Projects illustrated by a Factory Planning Case Study. In:  Institute of Industrial Engineers, USA , editor. How business take flight : IIE annual conference and expo 2008, May 17 - 21, The Westin Bayshore, Vancouver, BC, Canada ; conference proceedings ; [including] 2008 Industrial Engineering Research Conference. Norcross, Ga. : Institute of Industrial Engineers ; 2008. p. 643–8.</van>
<havard>S. Hinrichsen, C.M. Schlick, P. Steiger, H. Wurz, Forecasting Method for Estimation of Labor Times in Complex Projects illustrated by a Factory Planning Case Study, in:  Institute of Industrial Engineers, USA  (Ed.), How Business Take Flight : IIE Annual Conference and Expo 2008, May 17 - 21, The Westin Bayshore, Vancouver, B.C., Canada ; Conference Proceedings ; [Including] 2008 Industrial Engineering Research Conference, Institute of Industrial Engineers , Norcross, Ga. , 2008: pp. 643–648.</havard>
</bibliographicCitation>
</extension>
<recordInfo><recordIdentifier>624</recordIdentifier><recordCreationDate encoding="w3cdtf">2019-03-04T14:24:57Z</recordCreationDate><recordChangeDate encoding="w3cdtf">2023-03-15T13:50:04Z</recordChangeDate>
</recordInfo>
</mods>
</modsCollection>
