Please note that ELSA no longer supports Internet Explorer versions 8 or 9 (or earlier).
We recommend upgrading to the latest Internet Explorer, Google Chrome, or Firefox.
8 Publikationen
2016 | Konferenzband | ELSA-ID: 333 |

F.-J. Villmer, E. Padoano, and Department of Production Engineering and Management, Eds., Production Engineering and Management, no. 1. Lemgo, 2016, p. 304.
ELSA
| Dateien verfügbar
2016 | Konferenz - Beitrag | ELSA-ID: 457 |

Scheideler, Eva, Topology Optimization and Additive Manufacturing – A Perfect Symbiosis?. Production Engineering and Management Proceedings 6th International Conference (1). Lemgo, 2016
ELSA
| Download (ext.)
2016 | Konferenz - Beitrag | ELSA-ID: 584 |

S. Hinrichsen, D. Riediger, and A. Unrau, “Assistance Systems in Manual Assembly,” in Production Engineering and Management, Lemgo, 2016, no. 01, pp. 3–14.
ELSA
| Dateien verfügbar
2016 | Konferenz - Beitrag | ELSA-ID: 586 |

L. Li and L. Schulze, “In-Plant Milk-Run Distribution for Material Provision Optimization in Lean Production,” presented at the Proceedings 6th International Conference, Lemgo, 2016, no. 1, pp. 65–76.
ELSA
| Dateien verfügbar
| Download (ext.)
2016 | Konferenz - Beitrag | ELSA-ID: 587 |

M. Riediger and F.-J. Villmer, “Five Insights in Effectively Managing Product Development,” in Production Engineering and Management, Lemgo, 2016, no. 1, pp. 111–122.
ELSA
| Dateien verfügbar
| Download (ext.)
2016 | Konferenz - Beitrag | ELSA-ID: 590 |

S. Hinrichsen, “How Elasticity Indicators Support Cost Management,” in Production Engineering and Management, Lemgo, 2016, no. 1, pp. 123–131.
ELSA
| Dateien verfügbar
2016 | Konferenz - Beitrag | ELSA-ID: 593 |

A. M. Cantauw and L. Li, “Application of Swarm Intelligence for Automated Guided Vehicle Systems,” in Department of Production Engineering and Management, Lemgo, 2016, no. 1, pp. 133–143.
ELSA
| Dateien verfügbar
| Download (ext.)
2016 | Konferenz - Beitrag | ELSA-ID: 594 |

A. Otte, E. Scheideler, and F.-J. Villmer, “Project Cost Estimator - A Parameter-Based Tool to Predict Product Realization Costs at a Very Early Stage,” in Department of Production Engineering and Management, Lemgo, 2016, no. 1, pp. 281–292.
ELSA
| Dateien verfügbar
| Download (ext.)